HiL Connection Schematic
From OpenMBD
Revision as of 16:42, 21 February 2019 by Willard de Jong (talk | contribs) (→Connections Lely GCB)
This page depicts the necessary connections for the HiL Autodocking Demo. The connections are done according to the schematic below.
Connections Lely GCB
The Lely GCB is to be connected as seen in the picture below.
In this case, the ETH1 Port is used for Ethernet connection with the Switch, and the PWR port connected to the Power Source.