Difference between revisions of "ISO26262/V-Cycle/2-6 Safety Management during the concept phase and product development"
From OpenMBD
(Created page with "{{ISO26262}}") |
|||
Line 1: | Line 1: | ||
{{ISO26262}} | {{ISO26262}} | ||
+ | |||
+ | |||
+ | '''Requirements to the safety management during concept phase and product development:''' | ||
+ | |||
+ | * Roles, responsibilities defined | ||
+ | * Planning and coordination of safety activities | ||
+ | * Project-specific "tailoring" of the safety lifecycle | ||
+ | * Safety Case | ||
+ | * Confirmation Measures (Audits, reviews, assessments) | ||
+ | |||
+ | '''Work products are: ''' | ||
+ | |||
+ | * Safety Plan, resulting from ISO26262-2 chapter 6.4.3 (click here for template) | ||
+ | * Project plan (refined), resulting from ISO26262-2 Chapter 6.4.3.4 | ||
+ | * Safety Case (click here for template) (For ASIL A, the creation of a safety case is not mandatory!) | ||
+ | * Functional Safety Assessment Plan, resulting from ISO26262-2 Chapter 6.4.9 | ||
+ | * Confirmation measure reports, resulting from ISO26262-2 Chapter 6.4.7 to 6.4.9 | ||
+ | |||
+ | |||
+ | |||
+ | <center>''[[ISO26262/V-Cycle/2-6_Safety_management_after_the_item's_release_for_production| Next Chapter (2-6)]]''</center> |
Revision as of 11:39, 15 September 2017
Requirements to the safety management during concept phase and product development:
- Roles, responsibilities defined
- Planning and coordination of safety activities
- Project-specific "tailoring" of the safety lifecycle
- Safety Case
- Confirmation Measures (Audits, reviews, assessments)
Work products are:
- Safety Plan, resulting from ISO26262-2 chapter 6.4.3 (click here for template)
- Project plan (refined), resulting from ISO26262-2 Chapter 6.4.3.4
- Safety Case (click here for template) (For ASIL A, the creation of a safety case is not mandatory!)
- Functional Safety Assessment Plan, resulting from ISO26262-2 Chapter 6.4.9
- Confirmation measure reports, resulting from ISO26262-2 Chapter 6.4.7 to 6.4.9