Difference between revisions of "ISO26262/V-Cycle/3-6 Initiation of the Safety Lifecycle"
Line 1: | Line 1: | ||
{{ISO26262}} | {{ISO26262}} | ||
− | [[File:3. | + | |
+ | [[File:3.V-Cycle-Concept Phase.png|278px]] | ||
Revision as of 07:55, 28 September 2017
During the Initiation of the safety lifecycle the distinction between a new product or an existing product is made. In case of an existing product the safety lifecycle may be taylored on the condition that the tayloring can be justified and that the justification is documented in the Safety Case.
Work products:
- Impact analysis
- Safety Plan (refined)
Downloads
Click here to download the Safety Plan template