− | During the Initiation of the safety lifecycle the distinction between a new product or an existing product is made. In case of an existing product the safety lifecycle may be taylored on the condition that the tayloring can be justified and that the justification is documented in the Safety Case. | + | During the Initiation of the safety lifecycle the distinction between a new product or an existing product is made. In case of an existing product the safety lifecycle may be taylored on the condition that the tayloring can be justified and that the justification is documented in the Safety Case. Either way, all the Safety Activities will be defined during this stage and will be documented in the Safety Plan. This will be used as input for the project planning. |
+ | |||
+ | The <u> Item Definition </u> is used as input to this clause. | ||
Line 16: | Line 18: | ||
'''Downloads''' | '''Downloads''' | ||
− | + | * [[:File:Safety_Plan_Template.docx|Safety Plan, Template]] | |
Revision as of 12:54, 17 October 2017
During the Initiation of the safety lifecycle the distinction between a new product or an existing product is made. In case of an existing product the safety lifecycle may be taylored on the condition that the tayloring can be justified and that the justification is documented in the Safety Case. Either way, all the Safety Activities will be defined during this stage and will be documented in the Safety Plan. This will be used as input for the project planning.
The Item Definition is used as input to this clause.
Work products:
- Impact analysis
- Safety Plan (refined)